The scenario
In a CEP flow (courier, express and parcel), goods are packed into handling units (HUs). When packing is complete, the HU is closed and moves on to labelling and shipping. Sometimes a closed HU has to be opened again. An item is missing, the wrong item went in, or the order changed at the last minute.
How the two products handle it
In SAP LGM, repacking an HU after it has been closed is straightforward. The packer opens it, corrects it and carries on.
In SAP EWM, the same situation may need IT to remove the closed indicator before repacking can continue. At a busy pack station, an exception that waits for a ticket holds up a shipment.
The wider point
This is not about ranking one product above the other. LGM is not meant to be a direct comparison with EWM, or to replace it. But good process design in LGM can inspire improvements in EWM, and proven EWM capabilities can shape LGM.
Whatever the solution, the goal is the same. Adopt and repeat the best process wherever it brings more business value, a simpler operation and a better experience for the people using it.
Choosing between the two for a site is a separate question. Our note on EWM, TM and LGM covers it.


